# Temporary Roof Leak Repairs in Idaho Falls

> Temporary repairs addressed two seams, two corners and boot flashing near rooftop equipment at an Idaho Falls restaurant. A separate silicone-restoration proposal covered a longer-term option.

Canonical: https://commercialroofingadvisors.com/projects/idaho-falls-restaurant-temporary-leak-repair

Idaho Falls, Idaho · Restaurant

Temporary repairs addressed two seams, two corners and boot flashing near rooftop equipment at an Idaho Falls restaurant. A separate silicone-restoration proposal covered a longer-term option.

**Building**: Restaurant

**Location**: Idaho Falls, Idaho

**Service**: Temporary leak repairs

[View project photos ↓](https://commercialroofingadvisors.com/projects/idaho-falls-restaurant-temporary-leak-repair#project-photos)

## A recurring leak near kitchen equipment

The roof had a history of leakage near equipment serving the restaurant. Earlier caulk, peel-and-stick patches and coatings surrounded the area, and the assessment also found standing water near several drains.

## The temporary repair work

The October service work focused on two seams, two corners and boot flashing. The closeout photographs show treated details around equipment and a penetration within the existing roof.

## A longer-term restoration option

The separate proposal considered cleaning, preparation, localized repairs and GAF High Solids Silicone Roof Coating over the restaurant roof. Drainage reconstruction, neighboring tenant roofing and structural work would require their own scopes.

## Before and after the service

The gallery includes the October 12 condition photographs and the October 21–22 repair photographs. Together they show the layered repair history and the locations that received temporary attention.

## Project details

****Property****: Restaurant in Idaho Falls, Idaho

****Assessment****: October 12, 2026; 20-image condition record

****Reported repair scope****: Two seams, two corners and boot flashing

****Work stage****: October 21 repairs; October 22 closeout photographs

****Area limit****: Restaurant roof area; neighboring tenant work not included

## Project timeline

**October 12, 2026**
Condition assessment and 20-image record of ponding, prior patches and equipment-area conditions.

**October 13, 2026**
Separate restoration and temporary-repair options documented.

**October 15, 2026**
Temporary repair approval recorded.

**October 21, 2026**
Contractor reported repairs to two seams, two corners and boot flashing.

**October 22, 2026**
Completed-repairs photo package supplied and forwarded; image groups include October 21 and 22 dates.

## The roof in detail

Select an image to enlarge.

**Temporary seam repair**
Treated seam beside rooftop equipment in the Idaho Falls temporary repair documentation.**Temporary corner repair**
White repair material at a roof corner beside equipment in Idaho Falls.**Equipment-area repair detail**
Close view of treated roof detail beside rooftop equipment in Idaho Falls.