# Parking Facility and Skyway Roofing Options in Minneapolis

> Read CRA's actual 16-page Minneapolis roof repair and replacement proposal, with site photos and marked work areas. Pricing and customer details are redacted.

Canonical: https://commercialroofingadvisors.com/projects/minneapolis-skyway-roof-options

Minneapolis, Minnesota · Roof repair and replacement planning

Three roofing options compare targeted repairs, longer repair runs and full replacement at a Minneapolis parking facility and skyway. The proposal includes marked work areas, measurements and roof photographs.

**Project stage**: Proposal delivered November 6, 2026

**Public document**: 16-page proposal; pricing and customer information redacted

**Roof areas**: Two parking-facility roof areas and the long skyway

**Requested repairs**: 300 linear feet across three areas

**Measured repair alternative**: 1,117 linear feet of specified wall runs

**Replacement alternative**: Approximately 24,814 square feet

**Proposed replacement system**: Fully adhered 60-mil EPDM with insulation and cover board

## Roofing proposal

Explore the complete proposal: three distinct roofing options, annotated work-area references, existing-condition photographs, scope details and project coordination requirements.

**PDF · 16 pages · Proposal: November 6, 2026**

Pricing, payment percentages and customer-identifying information have been redacted. The photographs, measurements and original scope descriptions are retained.

[Open the full proposalPDF](https://commercialroofingadvisors.com/documents/projects/minneapolis-roof-options-proposal-public-2026-11-06.pdf)[Download the proposal16 pages · Photos and marked work areas](https://commercialroofingadvisors.com/documents/projects/minneapolis-roof-options-proposal-public-2026-11-06.pdf)

## Two roof areas and a connecting skyway

Ponding at the roof edges, cracked membrane at a ramp-wall transition and tenting near wall details led to a closer review. Annotated photographs and overhead views locate the proposed work across the two parking-facility roofs and the skyway.

## Targeted repairs: 300 linear feet

The first option covers two 50-foot locations in each main roof area and a 100-foot skyway location. It includes the specified transition work, membrane-patching allowances, cleanup and ballast troughs at the main roofs.

## Longer repair runs: 1,117 linear feet

The second option extends the work to 307 feet in Roof Area A, 313 feet in Roof Area B and 497 feet along the skyway’s right parapet. The scope covers exposing the affected areas, repairing the EPDM transitions and restoring the specified details.

## Full replacement

The third option replaces the three roof areas. The complete proposal sets out the removal, new roofing, perimeter and transition details, and coordination requirements so the owner can compare a repair investment with replacement.

## Project timeline

- **November 3–5, 2026**
Dates identified on the existing-condition photograph pages.
- **November 6, 2026**
Revised three-option proposal delivered, including replacement of all three roof areas.

## Existing roof conditions

Selected annotated photographs from the proposal. Open the PDF for the complete work-area context.

**Ponding along the roof edge**
A site photograph in the proposal marks standing water near the roof edge. It records an existing condition considered during repair and replacement planning.**Cracked membrane at the ramp wall**
The marked photograph identifies cracking near the ramp-wall transition. The proposal separates local repair work from removal and replacement of the complete roof assembly.