Leaks above the office and bathroom
Water intrusion was affecting the store’s office and bathroom. Standing water on the roof and stained ceiling tiles pointed to a problem that had grown beyond the earlier partial-repair discussion.
From tear-off to a new EPDM roof
The replacement scope called for removing the existing roof covering and installing a new EPDM system. The project photographs follow the tear-off, the black membrane roof field and the details at walls, equipment curbs, roof edges and pipe penetrations.
Before, during and after
The September 4 photographs show the original roof conditions. The October 6 photographs follow removal of the old covering, and the October 11 photographs show the roof after the work. The completion report brings those stages together with the interior ceiling-tile follow-up.