Clearing the drain area
The October 30 service visit included removing debris from the drain area. The after photograph shows both drain covers and the surrounding roof after cleanup.
Patching the membrane
A localized patch was installed at the identified membrane opening. The November 2 completion report pairs the original opening with the repaired detail.
Planning the next maintenance work
Coating, ongoing maintenance and reglet work were considered separately after the leak repair. The gallery includes wider roof and equipment views to put the serviced areas in context.