Ponding at the roof edges, cracked membrane at a ramp-wall transition and tenting near wall details led to a closer review. Annotated photographs and overhead views locate the proposed work across the two parking-facility roofs and the skyway.
Targeted repairs: 300 linear feet
The first option covers two 50-foot locations in each main roof area and a 100-foot skyway location. It includes the specified transition work, membrane-patching allowances, cleanup and ballast troughs at the main roofs.
Longer repair runs: 1,117 linear feet
The second option extends the work to 307 feet in Roof Area A, 313 feet in Roof Area B and 497 feet along the skyway’s right parapet. The scope covers exposing the affected areas, repairing the EPDM transitions and restoring the specified details.
Full replacement
The third option replaces the three roof areas. The complete proposal sets out the removal, new roofing, perimeter and transition details, and coordination requirements so the owner can compare a repair investment with replacement.