Cleaning around the equipment and walls
Organic buildup, debris and loose screws were removed from the existing roof. The work included the narrow equipment corridor and roof-to-wall transitions, where dirt and moisture had collected.
Localized membrane repairs
The repair method used a urethane base coat followed by silicone top-coat patches at the affected locations. The before-and-after photographs show individual repairs beside equipment, along the wall transition and across the cleaned roof field.
The completion report
The October 7 report includes paired photographs, roof-cleaning details and the localized repair sequence. Earlier close-up photographs are included below to show the conditions that led to the work.