Roof conditions under review
The photographs show seam and surface irregularities, earlier patches, lifted wall details, localized standing water, equipment-curb interfaces and vegetation near drainage components.
Repair before restoration
The proposed sequence addresses the targeted repair and replacement area before cleaning, detailing and silicone coating. A separate decking allowance covers a different part of the work.
Preparing the restoration scope
The condition report calls for checking dimensions, repair boundaries, drainage and concealed conditions in the field. Surface preparation, drying and adhesion testing are part of planning the coating work.


