Garland flex buildings can combine a wide shop roof with a narrower office or an added bay. CRA helps owners compare assemblies by drainage, deck condition and the work each section can support.
Map changes in elevation
Draw primary and secondary runoff routes on one plan. At the junction of a shop and office roof, check whether upper-roof discharge reaches a lower section before it reaches an outlet. A membrane change should account for that load and the height of transitions.
Resolve what can be retained
Confirm existing layers and moisture conditions by area before comparing recover and tear-off. Where only an addition has failed, document how the retained roof meets the new assembly and what happens at movement joints.
Put the operating boundary on the roof drawing
For a Jupiter–Miller site with frequent material deliveries, include lift access and dry-in limits. CRA can help frame a replacement scope in which slope, flashing clearances and protection below are priced together.
Commercial Roof Replacement and Installation in Garland, TX
Questions from Garland building owners
Can flat roofs over separate Garland tenant spaces drain to one outlet?
They can share drainage, but tenancy alone does not establish capacity or responsibility. Trace the areas served and have the design reviewed before altering the outlet or insulation layout.
What should be shown where a flat shop roof meets a higher office?
Show the wall termination, water arriving from above, finished heights and the transition between assemblies. Include which work is inside the proposed scope.

