Modified bitumen proposals should state the layer arrangement and installation method. For an occupied Mansfield building, the method affects preparation and operational coordination, so those decisions belong in the scope before a contractor arrives.
Identify the existing roof
Review available records and sample information where appropriate. Separate retained layers from materials scheduled for removal. Record unknowns about moisture or attachment rather than implying that a surface observation establishes the condition of the full assembly.
Coordinate installation
Discuss access, staging and any method-specific protection with qualified installers. Identify impacts on nearby intakes and occupied areas. The owner should understand operational constraints and responsibilities without being asked to design the contractor's safety procedures.
Document details
Specify edges, penetrations and drainage transitions along with the field layers. Retain material records and completion checks for future repairs. Confirm the Mansfield review path for the proposed work and keep allowances for concealed conditions visible until the investigation resolves them.

