A Mesquite warehouse considering spray polyurethane foam roofing needs a suitable substrate and a plan for maintaining its protective surface. CRA helps compare those obligations with drainage details, equipment clearances and active loading areas.
Check the proposed starting surface
Identify wet, loose or unsuitable existing materials and the preparation needed before application. Review slope and outlet changes with the appropriate designer. Separate selective removals from general application quantities so the proposed assembly is based on verified conditions.
Control exposure during application
Ask the contractor to define protection for vehicles, goods, air openings and nearby businesses, including weather limits. Compare the exclusion zone with the freight schedule. Retain foam, coating and inspection records so future upkeep follows the installed system's requirements.

