Richardson building alterations can obscure modified bitumen construction. CRA investigates enough of the assembly to support repair and renewal decisions.
Review the relevant area
Examine laps, flashings and surface condition. Confirm concealed layers where they affect scope and flag materials of uncertain compatibility.
Plan the method
Compare preparation, occupant protection and application requirements. Coordinate necessary safety review and retain detail records rather than basing the proposal only on the visible cap sheet.
Where the roof adjoins a converted technical room, include the protection requirements in the installation plan. Review the proposed application method with responsible safety personnel and identify equipment coordination before scheduling work.

