Two buildings, two repair areas
An assessment of approximately 37,793 square feet across two metal roofs identified recurring leaks, corrosion and aging repairs. The immediate repair scope focused on approximately 900 square feet of panel replacement in two marked areas, plus the gable and rake edges on a separate rear building.
Replacement panels from ridge to gutter
The revised scope specified 26-gauge PBR panels running continuously from ridge to gutter. The new panel runs avoided horizontal seams within the replacement areas. Ordering and field coordination covered panel dimensions, the existing profile and the tie-ins to retained roofing.
Matching the rear-building edge metal
The rear building needed complete gable/rake-metal replacement at both ends. The profile, finish and color were coordinated with the existing building so the repaired edges would form a consistent line.
The finished work
October 23 photographs show the replacement panel areas. October 27 photographs show the finished rake metal, elevations and corner returns. The gallery pairs those views with the earlier roof conditions.
Longer-term roof planning
The wider roof review also considered a TPO retrofit and full PBR panel replacement. Those larger options addressed the aging roof areas beyond the localized panel and edge-metal repairs.