Commercial Built-Up Roofing in Houston, TX

Get in touch with our team today

Repair and replacement planning for aging Houston built-up roofs

Get help with an aging built-up or tar and gravel commercial roof in Houston. Trace leaks, assess the roof layers and plan repairs or removal.

Confirm the layersIdentify the membrane beneath the stone and document repairs or other coverings added over time.
Map the leakMark when and where water appears inside, then compare those points with drain, wall and equipment details above.
Plan removal by areaSet the limits of gravel handling, roof removal and daily weather protection before work starts.

When a Houston property has an older tar-and-gravel roof, Commercial Roofing Advisors can trace water entry and determine where repair or removal makes sense. These roofs use layers of bitumen and reinforcing felt. On a gravel-surfaced roof, the visible stone can hide the condition of the membrane underneath. We use the roof layers, drainage and interior leak history to define the work before the crew disturbs a larger area.

Identify the roof under the gravel

Look for roof records first. One gravel-covered section may have built-up asphalt plies while a later addition uses a different assembly. A qualified roofer can review exposed edges and accessible details or open a small test area when the design calls for it. This gives the team a basis for matching repair materials and deciding which existing layers can stay.

Show each roof area and the places where it meets another assembly. Where gravel has collected near a drain or moved away from a wall, record both the surfacing and the detail it covers. Bare spots can tell you where to look closely, but the condition of the waterproof layers determines the repair.

Johns Manville built-up roofing systems and asphalt details

Trace water entry before opening a repair area

Water showing up indoors gives the roof team a starting point. It can travel away from the opening along the roof assembly or deck before it becomes visible. Share the timing of the leak, the affected rooms and whether water appears during driving rain or after the storm ends. Then have the roof team compare those observations with drain bowls, roof edges and nearby penetrations.

The National Weather Service documented heavy rain across the Houston area during Hurricane Beryl. After a similar event, ask the team to map problems that recur at the same location separately from new wet spots. Where conditions warrant, measure the affected area and verify suspected moisture before quoting a patch. That gives ownership a clear boundary between the known repair and any work that might be discovered after opening the roof.

National Weather Service Houston and Galveston Hurricane Beryl report

Price gravel removal and tear-off by roof area

Ask for separate quantities or allowances for collecting the aggregate, lowering it, removing plies and disposing of wet insulation. On an occupied building, agree where the crew will stage equipment and debris containers without blocking entrances or loading lanes. Ask how each opened section will be weatherproofed before the crew leaves for the day.

The Houston Permitting Center lists removal and proper disposal of the existing covering and felt, deck inspection, and drain checks in its commercial reroofing worksheet. If a proposal calls for keeping layers in place, ask which roof areas qualify and how the team checked their attachment, moisture and drainage. If removal exposes more deterioration, the bid should explain how the additional area will be measured and approved.

City of Houston commercial reroofing worksheet

Questions from Houston building owners

Does gravel on a Houston commercial roof mean it is built-up roofing?

Gravel can cover a built-up membrane or sit over a different assembly. Roof records, visible layers at the edge or a field sample can help confirm which system you have before any repair is specified.

Can an old tar and gravel roof be repaired in one area?

An isolated failure may be repairable if the surrounding layers are dry, attached and able to accept a compatible tie-in. Widespread moisture or deterioration calls for mapping the affected area before choosing how much to remove.

What do I ask for in a built-up roof replacement proposal?

Ask where gravel and roofing layers will be removed, what the bid includes for disposal, and how the contractor will handle hidden deck or insulation damage. The scope should show how crews will protect occupied areas and seal the open roof at the end of each shift.

Houston roof review request

Send your roof details.

Tell us where water shows up inside, whether the roof has a gravel surface and which areas the crew can access.

817-631-7212