An older McKinney commercial building may join roofs with different deck levels and wall conditions. CRA helps evaluate EPDM roofing with attention to attachment, changes in geometry and the details required at those joins.
Record the existing transitions
Locate expansion joints, short wall returns and connections to later additions. Have the design team address expected movement and supporting construction before a new membrane is detailed across the junction.
Compare the assembly components
Identify compatible insulation, cover board, attachment and flashing materials. Carry preparation and removal requirements into the bid rather than describing the project solely by membrane thickness or color.
Plan future intervention
Keep product and repair instructions with the roof-area record. Where equipment service is frequent, define traffic protection and the process for checking proposed repair compatibility before a later contractor works on the McKinney roof.

