A McKinney storefront roof may have short parapet returns, neighboring tenants and limited staging. CRA helps evaluate modified bitumen assemblies with the application approach and building protection included in the comparison.
Establish the existing base
Confirm deck and retained-layer condition through records and appropriate verification. Document wet or deteriorated areas separately, with clear preparation requirements for the portions proposed to remain.
Review application controls
Ask installers to explain the proposed method and site measures for occupants, openings and adjacent operations. Coordinate those requirements with the property manager before setting delivery or work hours.
Account for visible edge work
At a downtown property, identify whether coping or other exterior changes need address-specific historic review. Retain approved details and completed layer records so the final assembly can be maintained after the project team leaves.

