A McKinney owner considering spray polyurethane foam roofing needs a suitable substrate and a long-term protective-coating plan. CRA helps evaluate the proposed system alongside drainage corrections, adjacent activity and maintenance responsibilities.
Confirm substrate eligibility
Investigate retained moisture and deteriorated materials before proposing foam over the existing assembly. Review drainage geometry and clearances with the design team so slope changes do not create new problems at outlets or curbs.
Coordinate the application area
Have the installer define controls for wind, nearby vehicles and building openings. At a McKinney warehouse, compare the exclusion area with truck movements and identify conditions that would postpone the work.
Carry upkeep into the decision
Request inspection and recoating requirements for the proposed system, with installation and product records. Evaluate how the owner will fund and document those actions over time rather than treating the initial application as the last roofing expense.

